x

Site Features

Total Power

Between 3,000 - 4,000 Amps, 480/277 Volt, 3PH Power

Auto Parking Spaces

Average of Approximately 1.4/1,000

Dock High Truck Doors

Grade Level Doors

Immediate Access

to I-805, I-5 and SR-125 Freeways via Main Street or Olympic Parkway

Building Specifications

  • 3330 HERITAGE ROAD - BUILDING A
  • 3360 HERITAGE ROAD - BUILDING B
  • 3390 HERITAGE ROAD - BUILDING C

±105,550 SF

Freestanding Building

  • ±5,000 SF Office Including ±2,500 SF of Mezzanine Plus Office & Shop Restrooms
  • 32’ Ceiling Clear Height at 1st Column
  • Skylights Throughout
  • ESFR Sprinkler System
  • Column Spacing 50’ x 52’
  • 4,000 Amps of 277/480 Volt Power
  • Twelve (12) 9’x10’ Dock Doors
  • Two (2) 12’x14’ Grade Level Loading Doors
  • 6” Floor Slabs
  • 132 Auto Parking Spaces
  • Possible Secured Yard/Parking
  • 5.7 Acre Parcel
  • Immediate Access to I-805, I-5 and SR-125 Freeways via Main Street or Olympic Parkway
  • Available July 2023 (Projected)

±56,470 SF

Freestanding Building

  • ±4,000 SF Office Including ±2,000 SF of Mezzanine Plus Office and Shop Restrooms
  • Can be combined with Building C for ±98,300 SF
  • 28’ Ceiling Clear Height at 1st Column
  • Skylights Throughout
  • ESFR Sprinkler System
  • Column Spacing 50’ x 52’
  • 3,000+ Amps 277/480 Volt Power
  • Eight (8) Dock Doors
  • Two (2) Grade Level Doors
  • 92 Parking Spaces
  • Possible Secured Yard/Parking
  • 3.48 Acre Parcel
  • Immediate Access to I-805, I-5 and SR-125 Freeways via Main Street or Olympic Parkway
  • Available July 2023 (Projected)

±40,470 SF

Freestanding Building

  • Includes ±2,000 SF of Mezzanine
  • Can be combined with Building B for ±98,300 SF
  • Single Tenant Building
  • 28’ Ceiling Clear Height at 1st Column
  • Skylights Throughout
  • ESFR Sprinkler System
  • Column Spacing 50’ x 52’
  • 3,000+ Amps of 277/480 Volt Power
  • Four (4) Dock Doors
  • One (1) Grade Level Door
  • 6” Floor Slabs
  • 63 Parking Spaces
  • Possible Secured Yard/Parking
  • 2.46 Acre Parcel
  • Immediate Access to I-805, I-5 and SR-125 Freeways via Main Street or Olympic Parkway
  • Available July 2023 (Projected)